Accessing landslide damage under civil works exclusions
Typhoon-driven landslides hit a solar site, but issues arose on coverage for insured civil works and excluded cut slopes. This was…
Defective design or defective workmanship? Challenges of analyzing root cause
In a disputed highway collapse where the insured advanced a typhoon narrative, independent forensic findings on design and…
Damage to marine cargo – repair, replace and recovery
An eight-figure generator set was fire-damaged during sea transit hot works; a targeted technical survey validated what truly needed…
Driving an optimized restoration strategy for a battery explosion fire loss
A battery explosion caused fire and smoke contamination in a power plant control building, with the OEM initially recommending full…
Submarine cable damage at offshore wind farm
An offshore wind farm suffered power loss after a vessel’s anchor damaged a submarine cable, disconnecting seven turbines from the…
Extended maintenance or operational cover? Helping the insured navigate the crossover between the policies
A BESS container explosion raised complex questions over whether Construction/Erection cover or the operational Property policy…
Navigating regulatory complexities for flood loss in a bonded warehouse
A seven-figure bonded-warehouse flood loss complicated by customs control, multiple cargo interests and duty exposure—managed…
Managing delicate relations in liability claims - A case of triple errors
A high-stakes contamination incident escalated into a sensitive liability negotiation with a key customer—defused through careful…
Managing liability exposure for component defects
A defective electronics component triggered a costly recall and replacement—requiring precise allocation across Products Liability,…
Strategic expert reviews avoided litigation
A steam header failure drove major Property Damage and Business Interruption exposure at a biomass plant—resolved through…
Real Stories. Real Impact. Turning a major outage into a managed recovery
When a major power outage left more than 1,000 homes and businesses without power, Crawford mobilized quickly to help clients…
Real Stories. Real Impact. Avoiding costly delays
When a fire threatened a newly completed hospital just days before handover, Crawford accelerated recovery and kept a critical…