Data centres have become critical infrastructure, underpinning everything from cloud computing and digital services to artificial intelligence and high-performance computing. As dependence on these facilities grows, so too does the scale and diversity of the insurance exposures they generate.
According to Data Center Map, there are currently 13,118 data centres listed across 184 countries. McKinsey estimates that global demand for data centre capacity could almost triple by 2030, requiring nearly $7 trillion in capital investment to keep pace.
Reflecting this growth, the Swiss Re Institute expects global insurance premiums associated with data centres to increase from $10.6 billion to $24.2 billion by 2030.
This expansion brings significant opportunities, but also a rapidly evolving risk environment. The scale, technical sophistication and interconnected nature of modern data centres mean that even a relatively contained incident can have far-reaching operational and financial consequences.
Understanding the data centre supply chain
Data centre operations involve an extensive ecosystem of stakeholders. This includes owners, operators, hyperscalers, cloud service providers, AI and high-performance computing businesses, colocation tenants, contractors, utilities and specialist technology suppliers.
These relationships are further complicated by regional variations in operating models, competition between service providers and increasing pressure on the availability of essential infrastructure. Power generation, grid connections, network capacity and specialist equipment are all critical to successful operation.
From an insurance perspective, exposures can broadly be divided into two areas: construction and operational risks. However, these should not be considered in isolation, as issues arising during construction or commissioning can subsequently develop into significant operational losses.
Construction: Managing complexity before operations begin
Data centre construction shares many characteristics with other major infrastructure projects, but its specialist requirements create additional challenges. Security is particularly important given the sensitive information stored within these facilities, influencing everything from site access and contractor management to equipment handling and installation.
Projects typically involve extensive civil engineering, mechanical and electrical works, general installation and the integration of highly specialised equipment. Tight delivery schedules are essential, particularly where storage capacity has already been commercially committed to customers.
The logistics of transporting, receiving and protecting high-value equipment therefore require careful planning. Limited on-site storage and laydown areas can introduce additional risks, particularly where multiple contractors and suppliers are working to interdependent schedules.
The challenge for insurers and claims specialists is understanding how individual events can affect the wider project, including completion deadlines and future revenue generation.
Operational Risks: An interconnected exposure environment
Once operational, data centres present an equally complex range of potential loss scenarios.
Power and electrical infrastructure is fundamental. Failures involving grid supplies, uninterruptible power systems (UPS) or backup generators can cause immediate service disruption and potentially latent equipment damage.
Cooling systems are equally critical. A failure in mechanical cooling infrastructure can result in rapidly rising temperatures, forcing protective shutdowns and potentially affecting extensive areas of a facility.
Property damage and contamination arising from fire, battery incidents, water ingress or smoke can affect entire data halls. Restoration may require specialist investigation, decontamination and carefully coordinated reinstatement.
Business interruption and service interruption can generate losses significantly exceeding the value of physical damage. Contractual service-level agreements, service credits, customer obligations and complex revenue arrangements all influence the financial consequences.
Cyber and cyber-physical events introduce further complications, particularly where operational disruption occurs without physical damage. Establishing how an incident interacts with property, cyber and liability policies require careful technical and policy interpretation.
Also, contractual and liability exposures can involve multiple parties, each operating under different contractual arrangements. Establishing responsibility and quantifying losses requires an understanding of both the technical circumstances and the contractual relationships involved.
Why specialist claims expertise matters
A data centre loss is rarely confined to a single discipline. An electrical failure may trigger cooling disruption, equipment damage, service interruption and contractual claims involving multiple customers and service providers.
Successfully managing these scenarios requires a coordinated approach. At Crawford, that means bringing together expertise across a broad spectrum of areas, including engineering, construction, power infrastructure, mechanical and cooling systems, fire and contamination, cyber-physical events, liability and business interruption.
As data centre investment and operational dependence continue to accelerate, the insurance industry must recognise that these are not conventional property risks. The scale, interconnectedness and technical complexity of potential losses demand specialist expertise, combining major loss leadership, multidisciplinary technical knowledge and coordinated global delivery to investigate, manage and resolve every aspect of a data centre loss scenario effectively.
To help companies understand the complexities of a major data centre loss, Crawford and Zurich Global Specialty Claims Team are planning an interactive Data Centre Large Loss Workshop in February 2027.
The session will centre on a realistic loss scenario, “The August Bank Holiday Outage,” and will explore the unfolding impact of a major data centre failure, examining how a single event can trigger far-reaching operational disruption, financial loss and complex liability exposures. To find out more, contact Paul Handy. (paul.handy@crawco.co.uk)